Window furnishings ⌄
- Search
Cabinetry, benchtops, wall colour, flooring and lighting need to be considered together.
A new home can involve hundreds of individual selections, but the decisions rarely stand alone. A favourite dining table affects the space beside the kitchen. A curtain needs somewhere to stack when it is open. A built-in cabinet has to accommodate the equipment you will actually use, not simply look balanced in an elevation.
The most useful starting point for new build interior design in Sydney is a coordinated brief: what each room must do, what you are keeping, which decisions affect the building and who will confirm the details before anything is ordered. You do not need to choose every cushion before construction begins. You do need to recognise the choices that become harder to change once walls, wiring, joinery or ceilings are finished.
Tempo Interiors offers residential interior design and decorating, including guidance on finishes, furniture, window furnishings and joinery design. The level of planning, selection and coordination is agreed for each project. This guide helps you prepare that conversation and organise the decisions between your designer, builder and appointed specialists.
Write a short description of how each important room will work. For the living room, that might mean comfortable seating for the household, a clear route to the garden, somewhere for books and a place for children to play. For the kitchen, it might mean two people cooking together while another sits nearby. These are useful design requirements because they can be tested against a plan.
Separate essential needs from preferences. Accessible storage, a clear passage or space for an existing table may be essential. A particular handle or decorative finish may be flexible. If the budget needs adjusting later, this distinction helps you protect the things that make the home work.
The Australian Government's YourHome guide to designing a house treats the brief as something to revisit through design development. Keep your requirements current as decisions develop, rather than leaving the original brief behind once samples arrive.
Choose a small number of reference images and explain what you like in each. It may be the warm timber, the quiet palette or the position of a reading chair rather than the entire room. Tell your designer what you dislike as well. A clear brief leaves room for considered alternatives instead of asking everyone to reproduce an unrelated collection of photographs.
Gather the latest available floor plans, room dimensions, window information and any finishes already selected. Label the drawing date or revision so an older plan is not mistaken for the current one. If construction has started, explain what is already fixed and which decisions the builder needs next.
Add photographs and dimensions of furniture, art and rugs you want to retain. Include the practical details that are easy to overlook: whether a dining table extends, whether sofa cushions project beyond the frame and whether a cabinet needs space for its doors to open. Initial measurements help with planning; the appointed maker or installer must confirm any final measurements needed for manufacture.
State a realistic budget range and distinguish the building allowance from the money available for interiors. Ask whether your interiors budget includes furniture, window furnishings, rugs, delivery, installation and design fees. Mention a desired move-in date, but treat it as a planning input until the construction programme and individual orders have been checked.
Our Sydney interior design service is a starting point for discussing how much support you need, from selected rooms to coordinating a broader home interior.
Before progressing, ask for the scope of the design service in writing. Selection advice, a concept presentation, a detailed schedule and technical drawings are different deliverables. Do not assume that engaging a designer automatically includes every one of them, or that a builder's allowance includes the furniture and finishes you have in mind.
For each part of the home, establish who proposes the design, who checks the technical requirements, who measures, who orders and who installs. Also identify who approves the final choice and who needs to be told when it changes. A joinery finish selected with your designer still needs to match the maker's confirmed specification and approved drawings.
Keep responsibilities for building approvals, structural work, electrical work and other specialist requirements with the appropriately appointed professionals. Tempo's design conversation does not replace those checks. Ask which coordination tasks are included in your particular engagement and where another consultant, supplier or trade is required.
A simple written decision list is often enough to make the next step clearer. Record the room, item, current choice, outstanding question, responsible person and required decision date. It should be easy for everyone involved to identify what is confirmed and what remains provisional.
Place the main furniture on a scaled plan while there is still time to adjust related decisions. Consider the sofa, dining table, beds and any large pieces you are keeping. Check movement between rooms and access to doors, windows and storage, not just whether each item fits inside the room outline.
Look at the room in use. Can a dining chair be pulled out without blocking a passage? Can a wardrobe door open beside the bed? Will a side table be useful where the lamp is intended to sit? The appropriate clearances depend on the furniture and users; ask your designer to test the actual layout rather than relying on a single universal measurement.
This early exercise also informs lighting and power discussions. A planned reading position or desk location can be shared with the relevant specialists before their requirements are finalised. It does not mean every decorative piece must be purchased immediately. It means the layout has a clear direction before other work starts relying on it.
Flooring, cabinetry, benchtops, wall colours and nearby upholstery are seen together. Compare them as a group rather than approving each from a separate email or showroom visit. Begin with any finish that is already committed, then assess the remaining selections around it.
Use physical samples where available. Look at them in daylight and under the proposed lighting where practical, noting how texture, sheen and colour relate. Photographs and screens are useful for recording a direction, but they can alter colour and scale. Before ordering, check that the approved sample corresponds to the exact product, finish and specification being supplied.
Consider maintenance alongside appearance. Ask the supplier about the cleaning requirements, suitability and limitations of each proposed material. A finish that suits a lightly used display cabinet may raise different questions on a busy kitchen surface. Avoid assuming that matching colours mean matching performance.
Record substitutions carefully. If a selected surface becomes unavailable, compare the replacement with the whole palette, not just the original sample. A change in timber tone or sheen may affect nearby paint, fabric and hardware choices. Confirm any price or timing difference before approving the substitute.
Start with what the cabinetry must hold. Measure relevant equipment, list everyday objects and decide what should be visible. A media unit, study cabinet and wardrobe need different internal arrangements even when their external finishes belong to the same home.
For a media unit, discuss cable routes, access to connections and the equipment manufacturer's ventilation requirements with the maker and relevant specialists. For a study, think about the working surface, chair position and frequently used storage. In a bedroom, compare the space required for hanging clothes, folded items and larger pieces rather than treating every cupboard as interchangeable.
Check the relationship to the room. Cabinet depth, door swing and open drawers can affect nearby furniture and circulation. Windows, skirtings, switches and other fixed elements should be shown on the information used to finalise the design. Confirm which details require a site check before manufacture.
Our joinery design service in Sydney considers storage, proportions and finishes as part of the surrounding interior. Technical documentation, site measurement, manufacture and installation responsibilities should be agreed for your project before commissioning proceeds.

Window furnishings deserve an early place in the brief, particularly where you want recessed tracks, pelmets or motorisation. Ask how the proposed treatment will sit in relation to the ceiling, glazing, doors and adjacent joinery. A beautiful curtain still needs enough room to open and operate comfortably.
Discuss the appearance in both positions. Where will the fabric gather when the curtain is open? Will it overlap a door, cupboard or view you want to retain? If several layers are proposed, confirm the space required by the selected system rather than assuming that one track arrangement suits every window.
For motorised treatments, discuss the chosen system, control method and power requirements before relevant building or electrical decisions are completed. Requirements vary, so have the supplier and electrician confirm what applies to the proposed installation. Do not assume that an existing power point or a generic smart-home system will provide everything needed.
Tempo's custom curtains in Sydney can be considered alongside the room's other finishes and furnishings. Window-treatment quotation and measure services are distinct from a broader paid interior design engagement; confirm the appropriate service and scope when enquiring.

There is no single selection timetable for every new home. Ask the builder and suppliers which choices have to be confirmed before the next construction or manufacturing stage. Use those dates to organise the design conversation instead of relying on a generic countdown to move-in.
Decisions affecting openings, built-in dimensions, fixing arrangements or services generally need attention before the related work is completed. Finishes and product selections may then require approval before procurement or manufacture. Loose furniture can have its own ordering programme, so check availability and delivery arrangements rather than assuming it can all be left until handover.
Keep a small list of dependencies. For example, a cabinet opening may depend on the confirmed appliance model; a curtain recess may depend on the agreed track and layering; a rug size may depend on the approved seating layout. These are planning examples, not descriptions of a Tempo project. Each dependency should identify the information required and who will confirm it.
Consider a hypothetical open-plan living and dining room. The owner wants to keep an extending table and add storage beside a glazed door. First, the team tests the table at its extended size, including chairs and the route to the door. Next, the proposed cabinet depth and open doors are checked against that layout. The curtain supplier then confirms the space needed for the chosen treatment. Only after those relationships are resolved does the owner approve the cabinetry dimensions and nearby finish selections. The example is deliberately simple: three attractive items can compete for the same space unless they are considered together.
When comparing proposals, check that they cover the same work. A price for a cabinet finish selection is not directly comparable with a proposal that includes design development, drawings and site coordination. The same applies to furniture supply, delivery and installation.
NSW Government guidance on getting quotes recommends providing a specific written brief and consistent information. That is a useful discipline when comparing proposed scope, materials and product selections.
Ask what is included, what remains an allowance and what is excluded. If something has not yet been selected, find out how the final cost will be confirmed. Keep design fees and specialist services visible so that a lower initial product price does not hide work that still needs to be arranged.
If the budget needs reducing, return to your essential requirements. Perhaps decorative purchases can be staged while the space and fixing provisions are resolved now. Alternatively, a freestanding piece may meet a storage need without commissioning built-in cabinetry. Discuss the consequences of each option rather than making isolated cuts that create difficulties elsewhere.
Before an order is placed, check the information that makes the item identifiable: product or material name, colour, finish, dimensions, quantity and any relevant detailing. Confirm the latest drawing or schedule revision and make sure the person ordering has that version.
Ask for outstanding assumptions to be resolved. If a final site measure is required, establish when it happens and who signs it off. If you are approving a substitute, record what changed. Avoid treating a message such as “the same as the sample” as a complete specification when several samples or revisions have circulated.
Also confirm delivery access, storage arrangements and who will receive the item. A finished piece arriving before the site is ready creates a different problem from a delayed selection. Discuss these practical arrangements with the supplier and project team before committing to an order or delivery date.
Start when you can share a useful brief and plans, ideally before decisions affecting joinery, window furnishings and furniture layout are locked in. If building has already started, explain the current stage and ask which outstanding choices should be addressed first. Early discussion is useful, but the service and programme still need to be agreed.
Yes, retained furniture can form part of the brief. Provide photographs, dimensions and a note of why each piece matters to you. Test its placement before specifying nearby cabinetry or ordering complementary pieces. Reupholstery or a different arrangement may be worth discussing, but suitability and any proposed work require assessment.
Do not assume so. Ask exactly what the proposed service includes, what information you will receive and who coordinates with the builder and trades. Confirm responsibilities for technical drawings, approvals, site measurements, manufacture and installation separately where required. A clear agreement is more useful than relying on a broad service label.
Bring the confirmed specifications and samples, together with any orders already placed. Identify what can still change and what cannot. Your designer can then discuss a direction around those commitments instead of spending time developing options that the project can no longer accommodate.
Send your suburb, the stage of the build, available plans and the rooms where you would like help. Include the selections already made, furniture you want to keep, an approximate interiors budget and any decision dates supplied by your builder. You do not need a complete specification to begin, but this information makes the first discussion more useful.
Tempo works from its Mosman studio by appointment. Interior design consultations are paid; ask us to confirm the fee and proposed scope for your project. Enquire about coordinating your new home interior and tell us which decisions you would like help bringing together.
Found this guide useful? Add Tempo Interiors as a preferred source on Google.
SHIPPING
At Tempo Interiors we offer two different types of delivery, determined by the products in your order to ensure a great delivery experience.
We use specialist furniture removalist companies for all larger furniture items. Homewares and accessories are sent by Fastway carrier, rugs are sent by Startrack. Please note that multiple product orders are charged according to the product with the highest delivery type.
HOW DOES THE DELIVERY PROCESS WORK FOR FURNITURE?
Once items are dispatched, our allocated Transport Company for your area will contact the preferred delivery contact provided via phone or text to arrange delivery. Upon approach the transport company will make contact approximately half an hour ahead of delivery taking place to ensure both parties are prepared. Once on location the delivery will take place.
Our Transport Companies will perform a white glove service on delivery. White glove entails a full unpack, assemble, product placement and rubbish removal. All steps are taken with care and pride to ensure that any damages are avoided. Please inspect all deliveries before signing to accept the order.
HOW DOES DELIVERY PROCESS WORK FOR HOMEWARES?
Once dispatched from our supplier the carrier will deliver your order to your specified delivery address during business hours and orders must be signed for. Please ensure your delivery address is available during business hours.
HOW LONG FROM PLACEMENT OF ORDER ARE GOODS PICKED AND DISPATCHED?
Once the order has been paid, confirmed and processed We will pick and pack items within 48 hours of placement of order.
Orders are dispatched depending on the location.
CAN I PICK UP FROM The WAREHOUSE?
Yes, if you prefer to pick up items, please ensure to make prior arrangements with either the warehouse or your sales consultant.
WHAT IS ‘WHITE GLOVE’ DELIVERY?
All furniture orders come with our premium white glove service which includes full unpack of your goods, assembly, product placement and rubbish removal.
FREE FREIGHT
Tempo Interiors offer free freight on orders (metro deliveries) of $5,000 and above and capped freight at $170 on orders below $5,000 This is inclusive of GST. Metro covers deliveries to all suburbs within a 30 Kilometer radius of Brisbane, Sydney and Melbourne cities. All deliveries outside the metro area require a quote from Tempo Interiors.
HOW IS FREIGHT CALCULATED?
Freight is determined on several different aspects, these include size, location and frangibility. It is important to remember that freight is quoted based on ground level access, Deliveries into high rise units or access via stairs and lifts are considered an additional service and may incur further charges that will alter the freight quote.
TO AVOID ANY ADDITIONAL CHARGES, IT IS IMPORTANT TO ASK YOURSELF THE FOLLOWING QUESTIONS:
WHAT TO DO WHEN THE TRANSPORT COMPANY ARRIVES?
It’s very important that once the product has arrived that you thoroughly check items prior to signing for it. Any damages that may be found need to be reported on the spot and the transport company will return order for Tempo Interiors to revise.
During the quality control process the warehouse team insert a card into every box, that card will provide all necessary steps to undertake if stock arrives damage.
Please note all items must be personally inspected upon unpacking, as once the delivery is signed for claim of damage and faults may not be accepted by the carrier.
WHAT HAPPENS IF DELIVERY DOESN'T ARRIVE?
In the rare event that your delivery doesn’t arrive please contact Customer Care on 02 9960 2844, they will then track down order and resolve accordingly.
WHAT HAPPENS IF MY PRODUCT ARRIVES BROKEN?
During the quality control process the warehouse team insert a card into every box, that card will provide all necessary steps to undertake if stock arrives damage.
Please note all items must be personally inspected upon unpacking, as once the delivery is signed for claim of damage and faults may not be accepted by the carrier.
Please contact Customer Care on 02 9960 2844 for all further information.
DELIVERY TIMELINES
FURNITURE | Hunter & Co & Aussie Home Removals
Sydney Metro 2 Weeks
FURNITURE | INBOX
Melbourne Metro 2-3 Weeks
FURNITURE | Swift or DJ Lindsay
Brisbane & Gold Coast Metro 1-2 Weeks
FURNITURE | Anything and everything
Sunshine Coast Region 1-2 Weeks
FURNITURE | Pedemonts Transport
Adelaide Metro 3+ Weeks
Perth Metro 4+ Weeks
Please Note: All Regional areas require a Quote for all carriers. Contact your sales consultant for more information.
HOMEWARES | Partner Carrier Fastway or Startrack
Brisbane 1-3 Business Days
Sydney 1-4 Business Days
Melbourne 3-5 Business Days
Adelaide 3-6 Business Days
Perth 4-7 Business Days